Automation and electrical solutions in Hamilton, New Zealand

200,000 litre/day full organic dairy factory.

  • This was a seven month project where we designed, wired and commissioned the whole site.
  • This included mains cabling, MCC design and build, PLC wiring and layout, VSD communication over Ethernet, fiber-optic site communication through to domestic power and food grade lighting.
  • Incon designed and wired the controls of the three automated cheese tables built to cat 4 safety standards.
  • Full site automated essential generator backup system.